Benchmarking  
  Audit  
  Energy Rating  
  Promotion  
  ESCO Support  
  Demonstration
Projects
 
  Local Equipment Manufacturers  
  EE Financing  
index_publications
 
 
 

 
 
 

HOME
Site Directory
Contact Us
FAQ

MIEEP Programmes
Benchmarking
Audit
Energy Rating
Promotion
ESCO Support
Demonstration Projects
Local equipment manufacturing
EE Financing

Case Studies
Microwaves
Radiofrequency
Mechanical Vapour Recompression
Compressed Air System (US)
Compressed Air Leakage Control (Malaysia)
Compressed Air Control System (US)
Pump System Optimization (US)
Boiler Blowdown Heat Recovery (US)
Energy Saving (Malaysia)a
Holistic Approach to EE (Malaysia)
Readjustment of Boiler Burner (Malaysia)
Loss Optimasation On flow Dynamics (Malaysia)
line line2 Heveaboard
line line2
JG containers
line line2
Jayakuik
line
line2 Malayawata
line line2
Cargill Palm Products
line line2
Pan Century
line line2
Tritex
line line2
Retrofitting of  Cooling Tower at an Electronic Manufacturing
line line Facility- Energy & Water Savings , Year 2001 (Malaysia)
line line2
Replacement of Industrial Drying Fan- Energy Savings by line line Retrofitting with Performance Rated Fans for an Existing Grain line line Drying Process Chamber at Alor Setar, Kedah
line
line2 Air Compressors (Malaysia)
line line2
Energy Saving Replacement Of Industrial Drying Fan
line line2Replacement of Existing Crossflow Cooling Towers to Counterflow line lineCooling Tower, Year 2001 (Malaysia)

News, Articles and Other
line 1
Newss
MIEEIP in Singapore to promote EE Opportunities
Energy-use benchmarking for iron and steel sector
News Archive
Articles
Energy use in industries
E- use benchmarks for the cement industry
Tool for energy management
Demand side management
line 1
Presentation
line 1line 2
line 1
Others
Signing Ceremony of MoA between Mensilin Holdings Sdn
  and Vyncke East Asia Sdn Bhd
- Dr Annuar. Abdul Rahman, Chief Executive Officer, PTM

Opening remarks at Design Tools Follow-up Workshop for
  ESCOs
  - Mr. Ponudurai Rajamanikam. CTA MIEEIP
            
Opening remarks at Workshop of Business and Financial
Planning
- Mr. Ponudurai Rajamanikam. CTA MIEEIP

Signing Ceremony of the Master Energy Services
Agreement(MESA) between HeveaBoard Sdn Bhd
and Mensilin Holdings Sdn of Energy,
- YB Datuk Amar Leo Moggie, Minister Minister of Energy,
 Communications and Multimedia

Signing Ceremony of the Master Energy Services
              Agreement(MESA) between HeveaBoard Sdn Bhd
              and Mensilin Holdings Sdn
             - Tan Sri Dato' Mohamed Rahmat, Chairman
              HeveaBoard Sdn.Bhd
Services
Energy Audit Equipment For Rental
Download Rental Form
line 1
Press Release
 Date           T itle         
15 Dec 03   Mensilin signs MoA with Vyncke to supply
             EE Technology

17 Nov 03  Malaysian industrial sector offers opportunities
                 for investment in energy efficiency

line2  7 Aug 03  RM620,000 saving from energy efficiency
                 for chipboard manufacture

line2  1 July 03  MAESCO to participate in SMIDEX 2003

line2 12 May 03 Energy savings at Globalmas Sdn Bhd

line2  6 May 03 PTM and NPC sign MoU on energy-use
                benchmark

line2 7 Apr 03 Signing Ceremony of the Master Energy Services
             Agreement(MESA) between HeveaBoard Sdn Bhd
             and Mensilin Holdings Sdn

28 Feb 03 Potential for industrial savings and reduction
                          in CO2 emission
line 1
line 1
Tool
s and Download
line 1 line2Benchmarking and its Tools
line2Audit Results
line 1 line2Energy Management Team
line 1 line2Audit Checklist
line 1 line2Energy Audit Report Contents
line 1 line2High Efficiency Motor Fact Sheet
line 1 line2Boiler Best Practice Guide
line 1 line2MESA
line 1 line2ESCO Project Implementation
line 1 line2EE Demonstration Projects
line 1 line2Government EE & RE Incentives


Photo Album

Mieeip Newsletter