Title Retrofitting of Cooling Towers at an Electronic Manufacturing Facility – Energy & Water Savings, Year 2001
Purpose To carry out retrofitting of 4 x 1500 HRT Round Cooling Towers.(Total flowrate of 1,900 m3/hr)
Descriptions Before Installations After Installations
  pic1_case8 pic2_case8
  Rotating water distrubution sprinkler Stationary distributions system with non clog no 22/es
Retrofittings
1. Replace rotating sprinkler arms of the existing round type of cooling tower with a stationary low pressure water distribution system c/w non-clog nozzles.
2. Install a high performance Drift Eliminator system.
3 Adjust fan pitch angle
Result in savings
1. 1°C reduction in condenser water temperature was observed (which theoretically would correspond to 2% reduction of chiller compressor energy).
2. Measured water savings of 0.5% (from drift loss) of the total flowrate of 1900m3/hr.
(Calculation 0.5% x 1,900 m3/hr x 24 hours x RM 1.50/m3 x 300 days/year equals to RM 102,600 per year of water savings)
3. Energy Savings
a. Pump Head reduced by 3.5m (from 40m to 36.5m).
Pump Energy
= (Flowrate, m3/hr x Pump Head, M x Specific Gravity, m/s2) /
(367 x pump efficiency)
=(1,900 m3/hr x 3.5 m x 1 m/s2) / (367 x 0.75)
= 24.2 kW

b. Total Fan motor kW increased by 15.3 kW after pitching of fan angle.

c. Therefore nett Energy Savings
= 24.2kW – 15.3 kW = 8.9 kW

Cost / year savings on power consumption
= 8.9 kWh x 24 hrs x RM 0.20 / kWh x 300 days/ year
= RM 12,816.00